Contact us

Arkhos Center, 2100 Westheimer Ridge, Houston, TX 77056

+1 (713) 555-0142

Offshore platform silhouetted against a setting sun

Integrated energy since 1971

From reservoir to horizon.

We find, produce and deliver the oil and natural gas that keeps 27 countries moving, and we are cutting the carbon intensity of every barrel we bring to market.

Benchmarks · illustrative
BRENT78.42USD/bbl▲ 0.46 (+0.59%)
WTI74.18USD/bbl▼ 0.22 (−0.30%)
HENRY HUB3.124USD/MMBtu▲ 0.043 (+1.40%)
JKM LNG12.85USD/MMBtu▲ 0.14 (+1.10%)
TTF36.40EUR/MWh▼ 0.55 (−1.49%)
DUBAI77.10USD/bbl▲ 0.22 (+0.29%)
GASOIL712.25USD/t▲ 2.75 (+0.39%)
NYSE: AKHS61.37USD▲ 0.45 (+0.74%)

We have spent five decades learning to read the rock. Today we use that knowledge to produce energy with less waste, less flaring and lower emissions per barrel.

Arkhos is an integrated energy company. Our geoscientists, engineers and traders work as one team across the value chain, from the first seismic survey to the fuel delivered to a customer's tank.

We run 14 producing hubs on four continents, operate three high-complexity refineries and hold a 14.5 mtpa LNG portfolio. Every new project we sanction must be resilient at $45 Brent and meet our 2030 emissions targets.

About Arkhos

842kboe/d

Average oil and gas production in 2025

6.4bn boe

Proved reserves at year-end 2025, a 128% replacement ratio

27countries

Where we operate or hold equity interests

−41% since 2016

Operated Scope 1 and 2 emissions intensity

One connected system, from the first seismic shot to the customer's tank.

Owning each stage lets us move molecules to where they earn the most, and lets us measure and cut emissions at every handover.

How we operate

Stage 1

Upstream

Floodlit onshore drilling rig at night

Exploration and production in deepwater, shelf and onshore basins, guided by our own seismic imaging and reservoir models.

Production 842 kboe/dReserve life 11.2 years

Stage 2

Midstream and LNG

Twin pipeline running toward a gas flare

Pipelines, gas plants, terminals and a liquefied natural gas portfolio connect our resources to buyers in Asia and Europe.

LNG capacity 14.5 mtpaPipelines 6,800 km

Stage 3

Refining and marketing

Refinery units illuminated at night

Three high-complexity refineries make fuels, lubricants and petrochemical feedstocks. Port Arden now produces renewable diesel.

Refining capacity 960 kbbl/dRetail sites 2,300

Stage 4

Low-carbon solutions

Utility-scale solar farm

Carbon capture and storage, solar power for our own operations, offshore wind partnerships and lower-carbon fuels.

Low-carbon capex 11% of totalCO₂ storage 5 Mtpa from 2027

Four regions, 27 countries, one operating standard.

Hover over the map to see each asset. Select a region to focus on it.

Upstream LNG Refining Low carbon Office

Share of 2025 production, by region.

Featured projects

Long-life assets, sanctioned to perform in any price cycle.

Aerial view of a floating production vessel with its flare lit
ProducingDeepwater

Santos Basin, Brazil

Halcyon FPSO

Our largest operated asset reached 100 million barrels in under two years, with all associated gas reinjected.

Capacity 180 kbbl/dWater depth 2,140 mFirst oil 2024
Aerial view of storage tanks at a coastal terminal
CommissioningLNG

Pilbara, Western Australia

Corvina LNG Train 2

A second liquefaction train, powered partly by on-site solar, lifts Corvina's output to 7.6 million tonnes a year.

Capacity 3.8 mtpaStart-up Q1 2027Equity 65%
Manifold of steel pipework and valves
In constructionCCS

Central North Sea, UK

Skerry Point CCS

Captured CO₂ from industrial clusters will be stored 2,600 metres below the seabed in a depleted gas reservoir.

Phase one 5 Mtpa CO₂Injection 2027Partners 3
Pumpjacks silhouetted at sunset
ProducingOnshore

Permian Basin, USA

Basalt Ridge

Long-lateral wells and electric frac fleets have cut drilling time by 34% and emissions per barrel by half since 2019.

Output 212 kboe/dWells 1,140Methane 0.04%
Offshore wind turbines at sea
In constructionWind

Baltic Sea

Baltic Wind JV

A 30% stake in a 1.1 GW offshore wind farm, with power contracted to supply our Port Arden refinery.

Capacity 1.1 GWTurbines 73Power 2028

Lower-carbon barrels today, new energy businesses for tomorrow.

The world will need oil and gas for decades. We aim to supply it with the lowest emissions in our peer group while we build businesses in carbon storage, renewable power and low-carbon fuels.

Every target we set is tied to executive pay and checked by an independent assurer.
Elena Varga
Chief Executive Officer

Progress against 2030 targets

Assured by third party
Operated Scope 1 and 2 intensity−41% of −50%

Measured against our 2016 baseline.

Routine flaring eliminated86% of 100%

Zero routine flaring at all operated assets by 2030.

Methane intensity0.07% → below 0.05%

Down from 0.21% in 2016, measured with satellite and drone surveys.

Low-carbon share of capital spending11% of 18%

$1.6 billion invested in low-carbon projects in 2025.

Read our transition plan
Operators monitoring assets in an operations control room
Integrated operations centreHouston · 24/7

Seismic to screen: better data, safer and faster decisions.

Our operations centre watches 31 assets in real time, and our imaging team processed 1.6 petabytes of seismic data last year.

4D seismic monitoring

Repeat surveys show how fluids move through a reservoir, so we place infill wells where the remaining oil is.

Digital twins

Live models of our plants predict equipment failures up to six weeks ahead and cut unplanned downtime by 27%.

Autonomous inspection

Drones and crawler robots inspect flare stacks and tanks, keeping people out of confined spaces and away from heights.

Recordable injury rate
0.19
Seismic processed, 2025
1.6 PB
Assets with a digital twin
31

Latest from Arkhos

Partner with Arkhos on the next generation of energy projects.

We work with national oil companies, governments, suppliers and communities in 27 countries. Tell us what you are building.